Midwest Terminals International –
Facility 1
Midwest Terminals International –
Facility 1
Midwest Terminals International, Inc. – Facility 1 Services
Stevedore Storage, Foreign Trade Zone, Rail Service, Cranes, Ship Loading Conveyors, Forklift, Rail-In-Rail Service, Transload and Truck
CSX Rail Billing Address
3518 St. Lawrence Dr
Toledo, OH 43605
Midwest Terminals of Toledo International, Inc. – Port Authority Facility 1
The Midwest Terminals of Toledo International (Toledo Lucas County Port Authority Facility 1) is the premier destination for vessels calling on Toledo. Located at the confluence of the Maumee River and Lake Erie, Facility 1 has no air draft and does not require tugboat assistance for docking. Facility 1 comprises 123 acres and has 23,000 feet of rail. Our location is served by CSX. The dock face is 4,100 feet long and dredged to seaway draft (26’6” or 8.08 meters).
Midwest Terminals’ Facility 1 makes four modes of transportation available onsite (vessel, rail, truck, and pipeline). Facility 1 has an extensive equipment fleet available for vessel activity including three mobile harbor cranes, loaders, material handlers, switching locomotives (including our new EV model) and a large set of forklifts. Put the experienced Midwest Team to work on your project!
Midwest Terminals International – Facility 1
Watch our aerial tour below.
Midwest Terminals International – Facility 1
Facilities
- 4100’ dock length – offering berth for up to 4 ships at a time
- Seaway draft – 26’6” / 8.08 meters
- 123 acres
- 260,000 square feet of inside storage
- New York Metal Exchange (NYMEX), Chicago Metal Exchange (CME) and London Metal Exchange (LME)
- Foreign Trade Zone (FTZ #008)
- Some commodities handled: Aggregates, Coal, Crude Oil, Industrial Metals (Zinc + Aluminum), Industrial Chemicals, Petroleum Coke, Pig Iron, Liquid Chemicals, Salt, Sulfur, Fertilizers, Steel Coils, Welded Pipe, Wind Blades, and Heavy Project Lifts.
Cranes
- Liebherr LMH 550 – 144 MT lift capacity (2021)
- 2 – Liebherr LHM 280 – 84 MT lift capacity (2010)
- Mantsinen 200 – 16 MT capacity at 34 meters
New Bulk Liquid Storage
- Operational early third quarter of 2024
- 1 – 50,000 bbI API 650 storage tank with floating roof with drain dry tank capable of easy services change
- 6 – rail car spots with 3000 bbI per hour loading route with vapor recovery
- 1 – 12″ barge loading pipeline and 10″ vapor recovery line
- Immediate room for 5 additional storage tanks and products
Rail Service
- CSX (unit train approved)
- Open switch with CN
- In-house switching capability – 3 locomotives all internal switching alone in house
- Capacity of 200+ cars
- Transloading available – bulk + liquid
- 23,000 feet of on-site rail / 7,010 meters